Related Posts
GBS attends seminar on introduction of control products from CUMMINS POWER GENERATION
In the morning of July 31st, 2009, at Melia hotel, No. 44 Lý Thường Kiệt, Hà Nội, CUMMINS POWER... read more
GBS Bàn giao SAMSUNG FLIP WM55R cho LUVINA
CÔNG TY CỔ PHẦN PHẦN MỀM LUVINA là công ty liên doanh có vốn đầu tư của Nhật bản,... read more
GBS installs four (04) AFOLUX All-in-One 42” for Vietnam National Shipping Lines -Vinalines
This computer was equiped to display such company information as: agenda or work schedule of leadership, internal information, notices... read more
Upgrading Carota station
In 30/07/2008, GBS upgraded Carota station for VINACOMIN-MINING GEOLOGY COMPANY. The system measures underground paramerers, and transfers data to... read more
GBS suppied All In One Computer for Phuc Khang Corporation
The All In One Computer was installed at the showroom ò Phuc Khang – 51 Ngo Thoi Nhiem, Ward 6,... read more
GBS nghiệm thu, bàn giao trạm đo thu thập dữ liệu địa vật lý tại Công ty địa chất mỏ – TKV
Ngày 06/11/2009 tại Quảng Ninh, GBS đã tiến hành nghiệm thu bàn giao trạm đo và thu thập dữ... read more
Bàn giao cơ sở hạ tầng 16 trạm BTS Mobifone tại Lạng Sơn và Phú Thọ
Sau thời gian khẩn trương thi công, ngày 10/01/2008, các cán bộ kỹ thuật GBS đã hoàn thành việc... read more
Design, manufacturing and transfering tensionmeter to Telecommunication Service provider Nortel Vietnam
Based on purchase order number 4502620704, in 05/03/2008 GBS transfered 10 tensionmeters to Nortel Vietnam Co.,Ltd, 5 set of... read more
GBS designed, supplied and installed Temperature warning and monitoring system for Vietnam Mobile Telecom Services Company VMS
In January, 2012 GBS J.S.C has handed over all temperature alert system and monitoring for Mobile Information Centre KVI.... read more
TRIỂN LÃM QUỐC TẾ
Từ ngày 15 đến 17/10/2009, tại trung tâm triển lãm Quốc tế Phú Mỹ Hưng đã diễn ra hội... read more
Leave a Reply